Customization: | Available |
---|---|
Material: | Metal |
Type: | Fasteners |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is high quality construction formwork fastner and used in many large construction projects,Such as High rise building,
Bridge,Tunnel, Nuclear power projects.
Features:
1. High tensile strength material
2. High process precision, precise thread.
3. Surface treatment: electroplated
SPECIFICATIONS FOR ADJUSTABLE STEEL PROP
|
|||
Description
|
scaffolding Concrete System Prop Strong Support Force Steel Shoring Metallic Scaffolding shoring Prop Adjustable | ||
Tube size
|
48/60mm, 40/48mm, 48/56mm
|
||
Tube Thickness
|
1.6-4.0mm
|
||
Adjustable Length
|
2400-3900mm, 2000-3500mm, 3000-5500mm or as per your drawing
|
||
Surface treatment
|
Hot dipped Galvanized, Pre galvanized, Painted, Powder coater
|
||
Type
|
Heavy Duty, Light Duty
|
||
MOQ
|
One container
|
||
Delivery time
|
within 20 days
|
||
Application
|
scaffolding and formwork
|
Cangzhou Xinyue metal products Co., Ltd., was established in 2016-01-27, registered capital of 1 million yuan, enterprise address is located in Cangzhou City, Hebei Province, paper room bridge village, the industry for metal products, business scope includes: Ductile casting, hardware, scaffolding parts processing, sales, goods and technology import and export business (subject to be approved according to law, approved by the relevant departments can carry out business activities)
Q: What's your MOQ(minimum order quantity)?
A: 1 tons at least.
2. Q: What's your packing methods?
A: Usual packed into woven bag + steel pallets or as your requirement
3. Q: What's your payment terms?
A: 30% advanced payment and balanced against copy of BL or 100% L/C at sight, or negotiate according to the order status.
4. Q: What's your delivery time?
A: About 20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the manufacturer of SCAFFOLDINGS&FORMWORK SYSTEM for many years.