Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems

Product Details
Customization: Available
After-sales Service: Online Support
Certification: CE, CSA, SGS
Still deciding? Get samples of US$ 0/Meter
Request Sample

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
15000 square meters
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
  • Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
H20 H12 H16
Molding Method
Forging Steel
Usage
Industry
Lengh
1 to 6 M Long
Material
Timber
Color
Yellow, Customized
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Application
Flat Formwork,Column Formwork etc.
Wood Moisture
12% +/- 4% at Delivery
Bending Resistance
10.9 Knm
Weight
Around 4.5-5kg/M
Shear Resistance
23.9 kN
Bearing Resistance
47.8 kN
Transport Package
Pallets
Specification
200mm (H)*80mm (W)*40mm Thick
Trademark
XY
Origin
China
HS Code
4418830090
Production Capacity
15000

Product Description

Product Description

 

Timber Beam Formwork for Core Wall and Columns Construction

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. 
The H20 beam is sturdy, easy to handle and at a weight of only 4.8 kg/m offers a high load-bearing capacity at large distances of walings.

Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
Product Parameters

 


 
Product name H20beam
Length ≤8000m
Width 80m
Thickness 40mm
Height 200mm
Glue Phenolic,Melamine
Material Eucalyptus,Spruce
Application Flat formwork,Column formwork etc.
Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
Our Advantages

1. Light weight and strong rigidity.
2. Stable in shape due to the highly compressed panels.
3. Water resistant and anti-corrosion treatment allows the beam more durable in site use.
4. Standard size can match well with doka or peri systems., universally used all over the world.
5. made of Finland spruce, water proof painted yellow.
Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
Packaging & Shipping

 


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork SystemsOur Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Building Materials Wooden I Beam H20 or H12 and H16 Timber Beams for Formwork Systems
FAQ
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier