Customization: | Available |
---|---|
Material: | Steel |
Type: | Stand |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is high quality construction formwork fastner and used in many large construction projects,Such as High rise building,
Bridge,Tunnel, Nuclear power projects.
Features:
1. High tensile strength material
2. High process precision, precise thread.
3. Surface treatment: electroplated
Standard: Diameter: OD48/OD60 Thickness:3.25mm Length: 500/1000/1500/2000/2500/3000mm Material: Q355 Surface: Hot Dipped Galvanized Ledger: Diameter: OD48 Thickness: 3.25/2.75/2.5mm Length: 600/900/1200/1500/1800/2100/2400/3000mm Material: Q355/Q235 Surface: Hot Dipped Galvanized Diagonal Brace: Diameter: OD48/OD42 Thickness: 3.25/2.75/2.5mm Vertical Length: 1500mm for shoring scaffolding system; 2000mm for operation scaffolding system Material: Q355/Q235/Q195 Surface: Hot Dipped Galvanized/Pre Galvanization Base Jack: Rod: 38*5*600 Plate: 150*150*6 Base Collar: 48.3*3.25*200 U head Jack: Rod: 38*5*600 Plate: 185*150*50*6 Metal Plank: Width: 210/225/240/250/300/320mm Length: 500-4000mm Staircase: As per the request of Client |
Cangzhou Xinyue metal products Co., Ltd., was established in 2016-01-27, registered capital of 1 million yuan, enterprise address is located in Cangzhou City, Hebei Province, paper room bridge village, the industry for metal products, business scope includes: Ductile casting, hardware, scaffolding parts processing, sales, goods and technology import and export business (subject to be approved according to law, approved by the relevant departments can carry out business activities)
Q: What's your MOQ(minimum order quantity)?
A: 1 tons at least.
2. Q: What's your packing methods?
A: Usual packed into woven bag + steel pallets or as your requirement
3. Q: What's your payment terms?
A: 30% advanced payment and balanced against copy of BL or 100% L/C at sight, or negotiate according to the order status.
4. Q: What's your delivery time?
A: About 20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the manufacturer of SCAFFOLDINGS&FORMWORK SYSTEM for many years.